The construction of 6 new outdoor courts is underway in Cowichan Lake on Vancouver Island.
Phase 1 is complete with the installation of new fencing that divides the courts. Five gates have been installed for easy access to the courts with minimal interruption of play. Phase 2 will commence May 18th with the installation of the posts for the nets and power washing of the courts in preparation for the resurfacing Phase 3 – level the court surfaces where required to remove dips (reduce water pooling) and repair surface where necessary - week of May 25 Phase 4 – resurface courts with silicon based paint – week of May 25. Target for completion is June 1 but is weather dependent and with minimal construction delays. More information here. Comments are closed.
|
We are always delighted to receive suggestions and/or contributions of content for this web site. Please send to [email protected]
|